Sizing guide

How many metres of manure belt do I need?

Estimate your belt quantity in a minute. We’ll check it against your drawing before you order.

Quantity (m²) ≈ belt width × (row length × 2 + roller allowance) × tiers × rows

mm 100–3000 Enter a value between 100 and 3000.
m 1–300 Enter a value between 1 and 300.
1–12 Enter a value between 1 and 12.
1–50 Enter a value between 1 and 50.
m Example value — use the figure from your cage drawing. 0–20 Enter a value between 0 and 20.
mm 0.5–3 Enter a value between 0.5 and 3.

×2 because a closed loop runs the row twice — the carrying run and the return run.

Total quantity

—m²

Length per belt
— m
Area per belt
— m²
Number of belts
—
Total linear metres
— m
Estimated PP weight (raw material)
— kg

This is an estimate for budgeting. Cut lengths are set from your cage drawing and roller positions — we confirm them on the quotation.

Send these numbers for a quote

Worked example (hypothetical numbers): 1.2 m × (100 × 2 + 4) = 244.8 m² per belt; 8 × 5 = 40 belts; 9,792 m² ≈ 9,800 m², 8,160 linear metres.

Inputs

Where the numbers come from

  1. 01

    Width

    Cage drawing (no universal width).

  2. 02

    Row length

    Tape or drawing; if rows differ, calculate each.

  3. 03

    Tiers & rows

    Count the tiers; take the number of rows from the drawing.

  4. 04

    Allowance

    Wrap around drive and idler rollers plus take-up travel (the T/CAAA 152—2025 draft requires at least 400 mm of tension adjustment at the idler).

Rough sizing

Only know the flock size?

You can only estimate the order of magnitude. At 450–540 cm² of cage floor per hen (MARA), 100,000 hens need 4,500–5,400 m² of cage floor; with the return run, belt quantity is roughly 9,000–10,800 m². Order from the drawing, not from this estimate.

FAQ

Questions buyers ask

Ask us directly

Send your cage drawing or question — we reply by email, phone or WeChat.

Email
Why multiply the row length by two?

A manure belt is a closed loop: the upper run carries manure and the lower run returns, each the length of the row.

Is belt area just row length × width?

No — that is only the upper run of one tier. Use width × (2 × row length + allowance) × tiers × rows.

Should I add an allowance?

Yes. The belt wraps around both end rollers and needs take-up travel. Take the figure from the cage drawing.

Get a quote

Get the belt specified to your cage.

Send your cage model, number of tiers and row length — or simply the cage drawing. We’ll come back with a specification and quotation.

= required

So we can reply.
Delivery port, timing, winter temperatures.